PYRAMID

Complete privacy: the courtyard becomes invisible to the curious, but allows free air circulation and sunlight to enter, thus avoiding the greenhouse effect. Symmetric profile design: the fence looks identical both inside and outside yard

SMART BENEFITS

Made of quality steel sheet (the same raw material used in the production of metal tiles), the blind fences have guaranteed anti-corrosion and aesthetic properties and are weather and UV resistant.

The raw material used allows the blinds to withstand climatic loads between -50°C and +120°C.

They have an anticipated lifespan of over 50 years.

Quick and easy assembly Quick and easy assembly which can be carried out by the customer without the help of a professional
Rigidity adapted to the profile type Rigidity adapted to the profile type
Minimum maintenance Minimum maintenance (no regular interventions: painting, varnishing, treatments against insects, sun or humidity)
Possibility of customization Possibility of customization (sizes / colors)
Air Flow Thanks to the design and positioning of the profiles, they allow free air circulation and eliminate the greenhouse effect
UV 15 YEARS Will maintain their color and will not fade, even after 15 years

FINISHES & COLORS

PYRAMID

High Matt

Finish with a 40-micron polyester paint layer, 5 microns thicker than the standard finish. The 3D textured surface provides a distinctive appearance and a pronounced matt finish.

Displayed product colors could vary from one screen to another, according to the display's settings or filters used. For best accuracy please make sure that you ask a sales representative for a color plate sampler.

TECHNICAL SPECIFICATIONS

PYRAMID
  • Total length of a blind profile max. 2000 mm
  • Total height of a blind profile 64 mm
  • Total width of a blind profile 92,1 mm

SMART INSTALLATION PRINCIPLES

step 1 INSTALLATION OF VERTICAL “U” PROFILES

Concrete or Brick Pillars

Position the Left Vertical "U" Profile on the post so that the opening hole of the profile is oriented towards the panel. Maintaining the position of the Left Vertical "U" Profile on the post, use a drilling machine with a ⌀5 drill, designed for perforating metal, drill the Vertical "U" Profile towards the post in steps of 30-40cm.
After finishing the drilling process, remove the Vertical "U" Profile from the post.
You will notice the reference points (in 30-40 cm increments) that will serve as markings for drilling the post in the next step. Using a drilling machine with a ⌀10 drill designed for perforating concrete, drill the post following the marking.

REPEAT THE ABOVE STEPS TO INSTALL THE RIGHT VERTICAL "U" PROFILE

step 2 INSTALLATION OF VERTICAL “U” PROFILES

Concrete or Brick Pillars

Insert the dowels into the holes in the post, drilled in the previous step.
Position the Left Vertical "U" Profile on the post
Make sure that the fixing holes of the post and those of the Vertical "U" Profile are aligned.
Using a Star or PH2 screwdriver, insert the dowel screws into the aligned holes and fix tightly by screwing.
Keep the profile firmly in place, through out the screwing process, to avoid its repositioning.

REPEAT THE ABOVE STEPS TO INSTALL THE RIGHT VERTICAL "U" PROFILE

step 3 INSTALLATION OF VERTICAL “U” PROFILES

Concrete or Brick Pillars

The installation process of the Blinds Profiles starts from the bottom up by "opening" the first row of clips (side, bottom) on the Vertical "U" Profiles installed in the previous step.

step 4 INSTALLATION OF VERTICAL “U” PROFILES

Concrete or Brick Pillars

Start assembling the Blinds Profiles from bottom to top. Position the Blinds Profile between the Vertical "U" Profiles.
Using the Drilling Machine with a ⌀ 5 drill designed for metal, drill the Blinds Profiles through the pre-made factory holes of the Vertical "U" Profiles.
Align the fixing holes of the Blind Profiles and the Vertical "U" Profiles. Insert the pop-rivet into the pliers / rivet gun. Place the Pliers / Rivet Gun perpendicular to the hole and rivet it in the 4 pre-drilled fixing points:

  • 2 in front (left + right)
  • 2 in back (left + right).

REPEAT THE ABOVE STEPS TO INSTALL ALL BLINDS PROFILES

step 5 INSTALLATION OF BLINDS PROFILES

Using the Drilling Machine equipped with a Ø4 metal drill bit, make four fixing holes in the Blinds Profile. Use the pre-drilled holes in the Vertical "U" Profiles (Left and Right) as a guide to mark the position of these holes.

step 6 INSTALLATION OF BLINDS PROFILES

Align the fixing holes of the Blinds Profiles and the Vertical "U" Profiles.

Insert the rivet into the Rivet Pliers / Rivet Gun. Place the Rivet Pliers / Rivet Gun perpendicular to the hole and rivet at the four pre-drilled fixing points.

  • 2 in front (left + right)
  • 2 to back (left + right)
step 7 INSTALLATION OF THE HORIZONTAL “U” PROFILE

Position the Horizontal "U" Profile with the opening hole of the profile facing downwards, covering the ends of the Vertical "U" Profiles.

step 8 INSTALLATION OF THE HORIZONTAL “U” PROFILE

Using the Drilling Machine with a Ø 5 metal drill bit, simultaneously drill the following:

  • Horizontal "U" Profile and Vertical "U" Profile in 4 fixing points:
    • 2 in front (left + right)
    • 2 in back (left + right)